Back to the Village
12 stepsALL HOUSES
Build directions

Icicle Cottage

The finished Icicle Cottage with its windows lit

Before you start

How a window goes on

Dress the walls flat on the table before they go up. Every layered window and door goes on in the same order, from the bottom up. Here is one window, piece by piece, with the new piece in gold.

  1. Sill, shown in gold
    1. SillPush the sill's two end tabs into the pair of slots under the window.
  2. Vellum, shown in gold
    2. VellumLay the vellum on the wall, its bottom edge against the sill.
  3. Frame, shown in gold
    3. FrameSet the frame over it so its bottom tabs drop into the sill's notches.
  4. Hood, shown in gold
    4. HoodPress the hood on over the frame's top tabs, its own tabs into the slots above.
  5. Snow cap, shown in gold
    5. Snow capStand the snow cap in the hood's two front slots.
  1. Step 1: The front door

    Step 1, the front door: the new pieces shown in gold

    Lay the front wall flat on the table, engraved side up. Push the door step's two end tabs into their pair of slots near the bottom of the wall. Lay the door's vellum on the wall with its bottom edge against the step, then set the door over it so its two bottom tabs drop into the step's notches. Press the hood on over the door's top tabs, its own two tabs into the slots above, and stand your name plaque in the hood's two front slots.

    Pieces for this step
    DOOR
    STEP
    HOOD
    NAME PLAQUE
  2. Step 2: The windows

    Step 2, the windows: the new pieces shown in gold

    The two candle windows and the round window up in the gable go on next: sill, vellum, frame, hood, then the snow cap in the hood's front slots. Each window goes on the same way, as shown above.

    Pieces for this step
    WINDOW × 2
    SILL × 2
    HOOD × 2
    SNOW CAP × 2
    WINDOW
    SILL
    HOOD
    SNOW CAP
  3. Step 3: Hang the wreath

    Step 3, hang the wreath: the new pieces shown in gold
    Close up of step 3

    Push the wreath peg through the slot in the door and the wall from the front, so its lip ends up in front and on top. Lift the wreath, slide it over the peg and let it drop so the notch at the top of its hole sits on the peg.

    Pieces for this step
    WREATH PEG
    WREATH
  4. Step 4: Floor and front wall

    Step 4, floor and front wall: the new pieces shown in gold

    Lay the floor flat, tealight opening in the middle. Stand the front wall on the floor's front edge, door facing out, and slide it in so its bottom tabs drop into the floor's notches.

    Pieces for this step
    FLOOR
    FRONT WALL
  5. Step 5: Right side wall

    Step 5, right side wall: the new piece shown in gold

    The right side wall slides in from its side and meets the front wall at the corner. The corner tabs mesh like fingers: work them together a little at a time.

    Pieces for this step
    RIGHT SIDE WALL
  6. Step 6: Back wall

    Step 6, back wall: the new piece shown in gold

    The back wall slides in from the back and locks into the right side wall the same way.

    Pieces for this step
    BACK WALL
  7. Step 7: Left side wall

    Step 7, left side wall: the new piece shown in gold

    The left side wall slides in from its side and finishes the box. It meets two walls at once: seat one corner, then the other.

    Pieces for this step
    LEFT SIDE WALL
  8. Step 8: Roof, left side first

    Step 8, roof, left side first: the new piece shown in gold

    The left roof panel goes on first (the one without the chimney slots). Its slots drop over the tabs along the tops of the front and back walls.

    Pieces for this step
    LEFT ROOF PANEL
  9. Step 9: Roof, right side

    Step 9, roof, right side: the new piece shown in gold

    Then the right panel. Its top edge runs on past the ridge and laps over the top of the left panel, so the ridge closes tight with no gap for the light.

    Pieces for this step
    RIGHT ROOF PANEL
  10. Step 10: Chimney

    Step 10, chimney: the new pieces shown in gold
    The pieces of step 10 on their own

    Build the chimney off the house first. Start with the tall wall, then slide the two angled side walls in from the sides, brick faces out, sloped edges toward the bottom. Slide the short wall in to close the box. Then set the chimney on the roof: its tabs go into the roof slots and the sloped edges sit flat on the roof.

    Pieces for this step
    CHIMNEY SIDE
    CHIMNEY SIDE
    CHIMNEY, TALL WALL
    CHIMNEY, SHORT WALL
  11. Step 11: Icicle trim

    Step 11, icicle trim: the new pieces shown in gold
    Close up of step 11

    Push each icicle trim half's tabs up into the row of slots near the front edge of the roof. The two halves meet at the peak.

    Pieces for this step
    ICICLE TRIM, A MIRRORED PAIR
  12. Step 12: Light it up

    The Icicle Cottage lit up at night

    Switch on the LED tealight, set it on the table, and set the cottage down over it so the light comes up through the round opening in the floor. Then drape the fairy lights over the roof and switch them on too. Use LED lights only, never a real candle.

All done

Show off your village

Post a photo of it lit up and tag @glazerslaser on Instagram.

Missing a piece or something will not fit? Email support@glazerslaser.com with a photo and we will sort it out.